建筑纠偏与平移如何无偏差的移?

来源?span>http://www.alephi.com/news/316.html  更新时间?019-05-27
  建筑纠偏与平?/b>如何无偏差的移位?
      How does building rectification and translation work without deviation?
      总长度是162米。宽33.6?br />       The total length is 162 meters. 33.6 meters wide建筑面积22,800平方?br />       Building area 22,800 square meters
     总重量为30,180?br />      Total weight 30,180 tons
     相当?.5个凯旋门
     Equivalent to 2.5 Triumphal Gates
     平动不仅要到288米,而且还要?0?br />      The translational motion is not only 288 meters, but also 90 degrees.
     从东到西,从南到?
     From east to west, from south to north!
     我们回忆一下这一?br />      Let's recall this item.
     中国最大的单体建筑平移项目

     China's largest single building translation project

     这波行动666!建筑本身可以“行走?

     This wave of action 666! The building itself can "walk"

     本次需要搬迁的主站房,地上3层,开2层,?62米,?36米,建筑面积22,800平方米。主站房面积大,需要更换?

     The main station, which needs to be relocated, has three floors above ground, two floors open, 162 meters long, 33.6 meters wide and 22,800 square meters building area. The main station has a large area and needs to be replaced.
     施工队将在国内平移工程中首次应用交替步态推平移技术,为建筑穿上“滑板鞋”。创造了中国最大的平动面积、最重的荷载和最长的单体建筑距离?br />     The construction team will apply the alternating gait translation technology for the first time in the domestic translation project to put on the "skateboard shoes" for the building. It has created the largest translation area, the heaviest load and the longest single building distance in China.
    平移?坐东向西

    Before translation: sit east to West

                 

    平移?坐南向北

    After translation: sit south to North

               

    对后溪汽车站的平移方案进行了多次比较
    The translation schemes of Houxi bus station are compared several times.
    最后,车站主楼将是整座建筑
    Finally, the main building of the station will be the whole building.
    平移带两个开放的房间
    Translational zone with two open rooms
    最远的一端相?88?br />     The farthest end is 288 meters apart
    主房?连同两层切割、公开自升?以及沿滑轨平移和旋转90°,要求挖一个大坑的平移范围,在基坑施工桩基础和开放腔的底?铺设轨道?终于将平移建?在轨道上移动?br />

    The main room, together with two-storey cutting, open jack-up and 90 degrees of translation and rotation along the sliding track, requires digging the translation range of a large pit. After laying the track at the bottom of the pile foundation and the open chamber, the building will eventually move on the track.

                            

    平移工程项目经理由三方面介绍。与传统的推拉技术相比,交替行走顶升平移技术可以保证平移的稳定性。在建筑与轨道的连接处安装了步行器进行平移,就像有“脚”的建筑一样。高功率液压推进装置安装完成后,建筑物将一次完成一英寸,沿轨道完成90度旋转,到达新场地?br />     The translation project manager is introduced from three aspects. Compared with the traditional push-pull technology, the alternating walking jack-up translation technology can ensure the stability of translation. Walkers are installed at the connection between the building and the track for translation, just like buildings with "feet". After the installation of the high power hydraulic propulsion device, the building will complete an inch at a time, complete 90 degrees rotation along the track, and reach the new site.
    稳定和安全是关键!深藏的秘密有诀?br />     Stability and security are the key! There are secrets to hide.
    如何选择切割位置?稳定与和平是关键

    How to choose the cutting position? Stability and peace are the keys

    为了保证主站机房平移的胜利,首先要确定好切割位置。因为的平移结构建筑是狭长的范围广泛,和建筑之间的跨列的第一层达?8?如果平移的传统建筑是减少根据规范?和负0,整体稳定性差,和正0和负0板承载力不足,难以支持30180吨的“身体”?

    In order to ensure the success of the translation of the main station computer room, the cutting position should be determined first. Because the translation structure building is narrow and wide in scope, and the first floor of the span between the buildings reaches 18 meters. If the translation of the traditional building is to reduce the positive and negative 0 according to the code, the overall stability is poor, and the positive and negative 0 plate bearing capacity is insufficient, it is difficult to support the 30180 tons of "body".
    开敞的二层立柱间距小,底层基础稳定。我们选择开放二层的切割位置,将三层主站房的地上建筑与二层的开放空间一起进行平移,最大程度上保证了平移的安全性。从经济的角度来看,选择开放式两层切割,不仅可以比较好地保养上层精美的装饰,增加平移面积,而且大大减少了平移的维修工作?br />     The open two-storey column spacing is small, and the bottom foundation is stable. We choose the cutting position of the open second floor to move the ground building of the three-storey main station building with the open space of the second floor, which guarantees the safety of the translation to the greatest extent. From an economic point of view, the choice of open two-layer cutting can not only better maintain the exquisite decoration of the upper layer, increase the translation area, but also greatly reduce the translation maintenance work.
   平移项目创始?br />    Founder of translation project
   怪物是如何旋转的?沃克的工作原?br />    How do monsters rotate? How does Walker work?

   主站房最长的平移间隔?88米。采用传统的拉推平移,依靠牵引绳牵引建筑物,就像拖车救援一样。当平移受到角度的限制时,会出现“卡轨”现象。项目部在国内首次应用了532个行走步行者,可以不受角度限制地调整方向,完成多角度、精准的交替行走,防止“卡道”?

                            

   The longest translation interval of the main station building is 288 meters. Using traditional pull-and-pull translation, the building is pulled by a traction rope, just like a trailer rescue. When the translation is limited by the angle, there will be "sticking track" phenomenon. The project department has applied 532 pedestrians for the first time in China, which can adjust the direction without restriction of angle, complete multi-angle and accurate alternate walking, and prevent "jamming".
   建筑纠偏与平?/b>如何无偏差的移位?实时校正有三宝,如何保证旋转移位不漂?团队设计了一种极限纠偏装置,相当于轨道卡和轨道装置。实时纠偏后,建筑物可沿既定轨道行走,自行标定至20mm以内?br /> How do building rectification and translation shift without deviation? Real-time rectification has three treasures, how to ensure that rotation shift does not drift? The team designed a limit rectification device, equivalent to track card and track device. After real-time rectification, the building can walk along the established track and calibrate itself to within 20 mm.

    如何完成同步旋转平移?PLC计算机控制技术转移的“中枢神经”行走装?反应后的位移信号,滑动的精度可以自动控制在2毫米,随时准确地调整的“行走”方向主要车站的房间,以确保建筑物的地方差异和同步反式

    How to accomplish synchronous rotation translation? The "central nervous" walking device transferred by PLC computer control technology, the displacement signal after reaction, the precision of sliding can be automatically controlled at 2mm, and the "walking" direction of the main station room can be adjusted accurately at any time to ensure the asynchronism and synchronization of the building's geovariance.